Women's Sexy Lingerie Lingerie Set Flower Sexy Uniforms Romantic Comfort Party Home Valentine's Day Nylon Backless Summer Spring Home Outfits
#6598587Copyright Violation Instructions
Please note:
When you choose pictures that need to be customized, you must ensure not to violate any copyrighs. If, after the completion of the customization, any copyright infringement problems should occur, we cannot be held responsible for those. Please make sure you agree to our Terms and Conditions. If you do not have any further questions you can click OK to continue shopping. Thanks again for choosing to shop with us.
Please make sure you agree to our Terms and Conditions.
Fit US Size
Fit UK Size
Fit EU Size
Fit US Size
Fit UK Size
Fit EU Size
Size | Fit US Size | Bust | Waist |
---|---|---|---|
Size | Fit UK Size | Bust | Waist |
Size | Fit EU Size | Bust | Waist |
S | 0-2 | 76-86 | 60-65 |
M | 2-4 | 78-88 | 65-70 |
L | 4-6 | 80-90 | 70-75 |
XL | 8 | 82-92 | 75-80 |
XXL | 10 | 84-94 | 80-85 |
3XL | 12 | 86-96 | 85-90 |
S | 6 | 76-86 | 60-65 |
M | 8 | 78-88 | 65-70 |
L | 10 | 80-90 | 70-75 |
XL | 12 | 82-92 | 75-80 |
XXL | 12-14 | 84-94 | 80-85 |
3XL | 14 | 86-96 | 85-90 |
S | 32 | 76-86 | 60-65 |
M | 34 | 78-88 | 65-70 |
L | 36 | 80-90 | 70-75 |
XL | 38 | 82-92 | 75-80 |
XXL | 40 | 84-94 | 80-85 |
3XL | 42 | 86-96 | 85-90 |
*This data was obtained from manually measuring the product, it may be off by 1-2 CM
*This data was obtained from manually measuring the product, it may be off by ½-¾ inch

- Actual fabric colors may vary slightly from online colors due to variations in screen color settings.
- The size charts may vary due to different products or suppliers. Measurements shown in the size guide refer to measurements of the garment, and not body measurements.
- Made of different fabric, the elasticity of clothing varies. Please check the elasticity description on our product page. Usually, you need to add some margin from the garment measurement to body measurement.
Inelastic: add 2-3cm from the garment measurement to body measurement.
Micro-elastic:add 1-2cm from the garment measurement to body measurement.
Stretchy: add 0.5-1cm from the garment measurement to body measurement.
High Elasticity: add 0-0.5cm from the garment measurement to body measurement. - This is a general size suggestion, please choose the size according to the size chart of each product.
Highlights
[Fabric] This exquisite lingerie set is crafted from delicate shear nylon, offering a luxurious and soft feel against the skin. The nylon fabric provides a micro-elastic fit, enhancing comfort while maintaining the seductive appeal of the intricate floral design.
[Style] The set features a high-neck halter top, adding an elegant and stylish touch to its overall look, while minimal support enhances its allure. The accompanying panties are designed with a low-rise cut to accentuate the body’s natural silhouette, combining both style and sensuality effortlessly.
[Design Highlights] The centerpiece of this lingerie set is its backless design, providing a daring yet refined appearance. The intricate floral lace pattern adds depth and sophistication, perfect for creating an enchanting look. The set is available in both black and white, catering to different preferences.
[Occasions] Perfect for romantic evenings, Valentine's Day, parties, or simply a special night at home, this lingerie set creates an ambiance of romance and elegance. It seamlessly blends boldness with charm, making it suitable for various intimate occasions throughout the year.
[Size Notice] Available in a wide range of sizes (S, M, L, XL, XXL, 3XL), ensuring a comfortable and flattering fit for different body types. Designed for adult women, this set combines comfort with a sexy uniform style, suited for women of all sizes seeking to elevate their intimate apparel collection.
Photos
Fit US Size
Fit UK Size
Fit EU Size
Fit US Size
Fit UK Size
Fit EU Size
Size | Fit US Size | Bust | Waist |
---|---|---|---|
Size | Fit UK Size | Bust | Waist |
Size | Fit EU Size | Bust | Waist |
S | 0-2 | 76-86 | 60-65 |
M | 2-4 | 78-88 | 65-70 |
L | 4-6 | 80-90 | 70-75 |
XL | 8 | 82-92 | 75-80 |
XXL | 10 | 84-94 | 80-85 |
3XL | 12 | 86-96 | 85-90 |
S | 6 | 76-86 | 60-65 |
M | 8 | 78-88 | 65-70 |
L | 10 | 80-90 | 70-75 |
XL | 12 | 82-92 | 75-80 |
XXL | 12-14 | 84-94 | 80-85 |
3XL | 14 | 86-96 | 85-90 |
S | 32 | 76-86 | 60-65 |
M | 34 | 78-88 | 65-70 |
L | 36 | 80-90 | 70-75 |
XL | 38 | 82-92 | 75-80 |
XXL | 40 | 84-94 | 80-85 |
3XL | 42 | 86-96 | 85-90 |
*This data was obtained from manually measuring the product, it may be off by 1-2 CM
*This data was obtained from manually measuring the product, it may be off by ½-¾ inch

- Actual fabric colors may vary slightly from online colors due to variations in screen color settings.
- The size charts may vary due to different products or suppliers. Measurements shown in the size guide refer to measurements of the garment, and not body measurements.
- Made of different fabric, the elasticity of clothing varies. Please check the elasticity description on our product page. Usually, you need to add some margin from the garment measurement to body measurement.
Inelastic: add 2-3cm from the garment measurement to body measurement.
Micro-elastic:add 1-2cm from the garment measurement to body measurement.
Stretchy: add 0.5-1cm from the garment measurement to body measurement.
High Elasticity: add 0-0.5cm from the garment measurement to body measurement. - This is a general size suggestion, please choose the size according to the size chart of each product.
Learn More About This Product

- Actual fabric colors may vary slightly from online colors due to variations in screen color settings.
- The size charts may vary due to different products or suppliers. Measurements shown in the size guide refer to measurements of the garment, and not body measurements.
- Made of different fabric, the elasticity of clothing varies. Please check the elasticity description on our product page. Usually, you need to add some margin from the garment measurement to body measurement.
Inelastic: add 2-3cm from the garment measurement to body measurement.
Micro-elastic:add 1-2cm from the garment measurement to body measurement.
Stretchy: add 0.5-1cm from the garment measurement to body measurement.
High Elasticity: add 0-0.5cm from the garment measurement to body measurement. - This is a general size suggestion, please choose the size according to the size chart of each product.
Report Copyright Infringement
Report Copyright Infringement
Successful Submit!
Thank you for submitting this report We will process as soon as possible
Item Added Successfully